Working process

Before, or/and during, after

  • 2013-04-23 11.36.55

    2013-04-23 11.36.55

  • 2013-04-24 19.18.38

    2013-04-24 19.18.38

  • Bar back work

    Bar back work

  • Bar back finished

    Bar back finished

  • Bar front work

    Bar front work

  • Bar front finished

    Bar front finished

  • Esc 1

    Esc 1

  • Esc 2

    Esc 2

  • Esc 3

    Esc 3

  • Esc 4

    Esc 4

  • G tiles top wall 1

    G tiles top wall 1

  • G tiles top wall 2

    G tiles top wall 2

  • Terrace tiles and bricks before

    Terrace tiles and bricks before

  • Terrace tiles and bricks finished

    Terrace tiles and bricks finished

  • Terrace slabs and bricks work

    Terrace slabs and bricks work

  • Terrace slabs and bricks finished

    Terrace slabs and bricks finished

  • Wall pots 1

    Wall pots 1

  • Wall pots 2

    Wall pots 2

  • Wall pots 3

    Wall pots 3

  • Wall pots finished

    Wall pots finished

  • Shower and tiles before

    Shower and tiles before

  • Shower and tiles after

    Shower and tiles after

  • Kitchen 1 before

    Kitchen 1 before

  • Kitchen 1 work

    Kitchen 1 work

  • Kitchen 1 finished

    Kitchen 1 finished